The Grand Remodel: The Construction Phase, week 21

Finally some progress! Bathroom tile was fixed, kitchen backsplash tile was installed, and gutter downspouts were installed.

The Grand Remodel: The Construction Phase, weeks 19 & 20

Not much progress over the last two weeks. The final stucco coat was at last applied, and several components of the HVAC system were put in place: heat pump, register covers, thermostat, lines tested with nitrogen gas and refrigerant (result: no leaks, yay!). But we still have no centralized heating, because the electrical work is […]